Customer
«UMMC» JSC, UK «Kuzbassrazrezugol» JSC
Object
Mokhovskaya 110/35/6 kV substation with outgoing 35 kV and 6 kV overhead lines
Construction of the Mokhovskaya 110/35/6 kV substation to replace the existing one.
  • construction of a 110 kV Mokhovskaya substation with a capacity of 2 x 40 MW
  • construction of three double-circuit 35 kV overhead lines Construction of new 6 kV overhead lines. 
Special features:
Shorter terms of design and survey work due to the fact that the location of the existing substation "Mokhovskaya" was approached by underground mine workings of the mine "Baikaimskaya" and the need to transfer loads to the new substation.