Implementation of the Power Delivery Scheme for the Akademik Lomonosov FNHPP based on the world's first nuclear-powered floating power unit (FPU) with 62.9 MW KLT-40S reactor units.
Design and exploration work was performed for the construction of the 10/110 kV Beregovaya Substation with a capacity of 2x40 mW, and a double-circuit 110 kV overhead electric line from the Beregovaya Substation to a tie-in point of the existing 110 kV overhead electric line, including the construction of a 110 kV indoor switchgear and outdoor substation. The specifics of work in permafrost conditions and unique wind loads, up to 40-80 m/s, are taken into account.