Development, justification and approval of the Scheme of external power supply and the Scheme of power output of the power unit of 35 MW for the construction of a pulp and paperboard mill with a capacity of 105 MW.
- Development and approval of the External Power Supply Scheme, construction of 110 kV switchgear with a capacity of 2 x 100 MW, overhead 110 kV, construction of 10 kV switchgear (8 kt)
- Construction of a 35 MW power unit and its technological connection to the Irkutskenergo power networks.
Necessity to integrate the new network and generating equipment into the existing power supply network of the SPI plant and subsequent transfer to the communal utility meters via optical fiber transmission system